Product Overview
Membrane can replace a second layer of plywood/concrete board and reduces the risk of tile cracks caused by movement in the flooring assembly. When integrated with Cable, the Membrane system is a best-in-class integrated uncoupling, waterproofing, and floor heating solution. Membrane eases the installation of Cable by simplifying the installation process.
Installation
Standard nVent NUHEAT Membrane

Step 1
Spread thinset mortar onto the substrate using a trowel.

Step 2
Press Membrane into thinset using a roller or a flat trowel.

Step 3
Route nVent NUHEAT Cable throughout the heated area.

STEP 4
Install floor covering.
Note:
1. Cable resistance must be tested before, during and after installation for warranty coverage
2. All wiring connections should be completed by a certified electrician